Category Archives: Management

bow weldment for elan

Designed up this bow weldment out of stainless.  This gets the tack point about 2 feet in front of the headstay for the new north sails top down furling gennaker, and code 0. Getting it fabricated in pdx and will … Continue reading

Posted in Management | Leave a comment

work on elan

We headed up to Vancouver, Canada to take the boat over to silva bay gabriola island, Canada. We verifying the boom roller furling for the owner, and also getting measurement and pictures for the design of the bow weldment.

Posted in Management | Leave a comment

install outriggers on Tiara 4300

Headed down to garabaldi to work on installing new outriggers on the Tiara 4300. With a lack of instructions, I was able to improvise and install and rig the outriggers. She is officially know a tuna fishing machine. Look forward … Continue reading

Posted in Management | Leave a comment

Macgregor out for sail

Finally got all the sails and rigging on the Macgregor 65. We took her out for an evening sail, to test everything. Even though she is 40 years old and needs some TLC, she still glides through the water like … Continue reading

Posted in Management | Leave a comment